ASME PVHO-1-2007 Safety standard for pressure vessel for human occupancy

ID

66B02B2CEBF44F48B89469652BA2AF93

文件大小(MB)

5.9

页数:

170

文件格式:

pdf

日期:

2024-6-23

购买:

购买或下载

文本摘录(文本识别可能有误,但文件阅览显示及打印正常,pdf文件可进行文字搜索定位):

ASME PVHO*1-2007,(Revision of ASME PVH0-1-2002),iCjr aji fI oyf ir vij tCjrf ir ja f11i ru! a0 ri fwjj,I I II I ip j j u I,セIl essムeis fTor,Human,Occupancv,A N AM E RI CAN N ATI 0 N AL STAN DARD,The American Society of,Meehamcal Engineers,Licensed to Qin Jinsonq. Downloaded 1/14/2009 12:21 AM. Single user license only. Copying and networking prohibited.,ASME PVHO-1-2007,(Revision of ASME PVHO-1-2002),Safety Standard,for Pressure,Vessels for,Human,Occupancy,AN AMERICAN NATIONAL STANDARD,The American Society of,Mechanical Engineers Three Park Avenue ?New York, NY 10016,Licensed to Qin Jinsong. Downloaded 1/14/2009 12:21 AM. Single user license only. Copying and networking prohibited.,Date of Issuance: November 16t 2007,The next edition of this Standard is scheduled for publication in 2010. There will be no addenda,issued to this edition.,ASME issues written replies to inquiries concerning interpretations of technical aspects of this,Standard. Once approved, interpretations are published on the ASME Web site under the Committee,Pages at http://cstools.asme.org and are subsequently published in the next edition of this Standard.,Users of this Standard are advised to check the ASME PVHO Committee Web page periodically for,interpretations, errata, and cases.,ASME is the registered trademark of The American Society of Mechanical Engineers.,This code or standard was developed under procedures accredited as meeting the criteria for American National,Standards. The Standards Committee that approved the code or standard was balanced to assure that individuals from,competent and concerned interests have had an opportunity to participate. The proposed code or standard was made,available for public reviewand comment that provides an opportunity for additional public input from industry, academia,regulatory agencies, and the public-at-large.,ASME does not “approve,” “rate," or "endorse1* any item, construction, proprietary device, or activity.,ASME does not take any position with respect to the validity of any patent rights asserted in connection with any,items mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability for,infringement of any applicable letters patent, nor assume any such liability. Users of a code or standard are expressly,advised that determination of the validity of any such patent rights, and the risk of infringement of such rights, is,entirely their own responsibility.,Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted as,government or industry endorsement of this code or standard.,ASME accepts responsibility for only those interpretations of this document issued in accordance with the established,ASME procedures and policies, which precludes the issuance of interpretations by individuals.,No part of this document may be reproduced in any form,in an electronic retrieval system or otherwise,without the prior written permission of the publisher.,The American Society of Mechanical Engineers,Three Park Avenue, New York, NY 10016-5990,Copyright . 2007 by,THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS,All rights reserved,Printed in U.S.A.,Licensed to Qin Jinsong. Downloaded 1/14/2009 12:21 AM. Single user license only. Copying and networking prohibited.,CONTENTS,Foreword.,Committee Roster .,Correspondence With the PVHO Committee,vii,viii,Summary of Changes,Section 1 General Requirements.,Introduction,Scope .,Exclusions ..,User Requirements ..,Manufacturer fs Data Report ..,Materials,Design and Fabrication Requirements,Pressure Relief Devices,Marking,Nonmetallic Materials and Toxicity Offgas Testing,Risk Analysis ..,-1,-2,-3,-4,-5,-6,-7,书,-9,-1,H,1,1,1,1,1,1,2,2,8,8,9,Section 2,2-1,2-2,2-3,2-4,2-5,Viewports.,General .,Design,Material.,Fabrication.,Inspection,Marking ..,Pressure Testing..,Installation of Windows in Chambers .,Repair of Damaged Windows Prior to Being Placed in Service,Guidelines for Application of the Requirements of Section 2 .,6,6,6,9,9,1,1,2,2,2,26 31,7,8,9,2,2,2,2,w,6,2,2,3,3,3,3,Section 3 Quality Assurance for PVHO Manufacturers,3-1 General ..,3-2 Responsibilities.,Section 4 Piping Systems,4-1 General,4-2 Material Requirements,4-3 Design of Components .,4-4 Selection and Limitations of Piping Components,4-5 Selection and Limitation of Piping Joints,4-6 Supports,4-7 Inspection.,4-8 Testing.,4-9 Systems..,348,8,网,-1,-2,-3,-4,-5,Section 5 Medical Hyperbaric Systems,General .,PVHO System Design .,Gas Systems .,Control Systems and Instrumentation,Environmental Systems..,5,5,6,7,8,9,0,0,0,1,9,9,9,9,0,0,&,8,8,8,8,8,9,9,9,9,9,9,9,9,0,0,1,1,ui,Licensed to Q……

……